The Maple Valley Short Line RR is now operational. I can successfully run two trains simultaneously on two long lines. The outer loop rises to four inches at 2% starting at the Maple Valley River Bridge. The inner line completes a circuit by passing through two tunnels, crossing the Maple Valley River, and winding through …
Continue reading Wiring the Maple Valley Short Line – Part 2